LeadSafeRules

Home › Contractors › RRP records

EPA RRP records for contractors: what to keep on every pre-1978 job

Short answer: If your firm is paid to renovate, repair or paint in housing built before 1978 (or a child-occupied facility) and the job disturbs painted surfaces, the federal RRP rule requires paperwork before, during and after the job — and you must keep it for 3 years after the job is completed (40 CFR 745.86(a)). EPA cases regularly cite missing records alongside missing pamphlets and certifications.

Does this apply in your state?

EPA runs RRP here — this page applies

  • NJ
  • NY
  • PA
  • OH
  • MI
  • IL
  • MD
  • DC

Your state runs its own program — check its rules too

  • AL
  • DE
  • GA
  • IA
  • KS
  • MA
  • MS
  • NC
  • OK
  • OR
  • RI
  • UT
  • VT
  • WA
  • WI

Also the Bois Forte Tribe runs its own program.

Source: EPA, as of Dec 2025 · EPA

The records, in plain English

1. Before work: the pamphlet

No more than 60 days before work, give the owner EPA’s Renovate Right pamphlet and get a written acknowledgment — or get a certificate of mailing at least 7 days before work. If the owner doesn’t live in the unit, also give it to an adult occupant and get their acknowledgment, or sign a certification of attempted delivery. Common areas need written notice to each affected unit or posted signs, plus a signed statement of what you did (745.84).

2. If you tested for lead

Keep the test kit manufacturer and model, the components tested, locations and results, or the paint chip lab results (745.86(b)(1)). Results below 1.0 mg/cm² or 0.5% by weight mean the component isn’t regulated lead-based paint (745.82).

3. The certified renovator’s job record

Proof a certified renovator was assigned (with a copy of their training certificate) and their signed certification that workers were trained (topics per worker), signs were posted, the work area was contained, waste was contained, the area was cleaned, and cleaning verification was done — including how many wet and dry cloths were used (745.86(b)(6)).

4. After work: give the owner and occupant a copy

At the final invoice or within 30 days of completion — whichever is earlier — give the owner (and the adult occupant, if different) the compliance information. EPA’s “Sample Renovation Recordkeeping Checklist” or a similar form is allowed (745.86(c)).

5. Keep your certifications current

Firm certification lasts 5 years; apply to recertify at least 90 days before it expires to be timely (745.89). Renovators must refresh before their certification expires and keep copies of their certificates on site (745.90).

Free one-page RRP records checklist

Before work (no more than 60 days before)

During the job

After the job

Download PDF

Free, no email needed. Our summary of 40 CFR 745.84–745.86, not an official EPA form.

What EPA has fined firms for

RRP Job Paperwork Kit — $49

Fill-in forms for every part of the job file above, in English and Spanish (printable PDFs, 9 pages each):

Get the full kit — $49

One-time payment by secure Stripe checkout. Your download link appears right after payment. Built only from the federal rule text — no made-up requirements. Not legal advice. For EPA-run states; state-run programs may need more.

Find certified firms or check a certification: EPA firm locator. Related: EPA RRP rule for landlords · Common-area notice rules

Sources checked Oct. 30, 2026.

Not legal advice. LeadSafeRules is an independent guide, not EPA. This page and the kit summarize the federal RRP rule (40 CFR 745 Subpart E) and EPA pages for information only. Rules change; confirm with the official source.

Español