Illinois lead mitigation notice: landlord 30 / 90-day deadlines

Short answer: An Illinois lead mitigation notice means an inspection found a lead hazard in your unit. Under the Lead Poisoning Prevention Act you must fix (mitigate) it within 30 days if the unit was inspected because of an elevated blood lead level in a child or pregnant person, or if a child 6 or younger or a pregnant person lives there; otherwise within 90 days (410 ILCS 45/9(5)).

Your deadline at a glance

Situation in the unitMitigation deadline
Inspected because of an elevated blood lead level in a child or pregnant person30 days from receiving the notice
A child 6 or younger or a pregnant person lives there30 days from receiving the notice
No such child or pregnant person lives there90 days

Source: 410 ILCS 45/9(5). Your notice states the deadline that applies to you.

Step by step after the notice arrives

  1. Read the notice and the inspection report. The agency (the Illinois Department of Public Health or its delegate agency) must tell you the deadline and describe mitigation that meets the Act (Sec. 9(1)).
  2. Optional: submit a mitigation plan to the agency for review and approval (Sec. 9(4)).
  3. Hire licensed help for paint-disturbing work. Mitigation that destroys or disturbs a lead-bearing surface must be done by a licensed lead abatement contractor using licensed supervisors or workers, unless the Department’s rules or a case-by-case waiver allow otherwise (Sec. 9(3)). The contractor must give you and the tenant the lead pamphlet no more than 60 days before work starts (845.25(c)).
  4. Running late? Ask for an extension before the deadline. The agency may extend it if you are making substantial progress, cannot get a licensed contractor in time, or are waiting on mitigation-plan approval (Sec. 9(6)).
  5. Follow-up inspection. After the deadline the agency re-inspects. If the hazard is fixed you get a certificate of compliance; if not, you get a deficiency notice and a mitigation order with specific actions and a new date, which can include abatement (Sec. 9(7)).

How to check a contractor’s license: Illinois lead inspector vs. abatement contractor.

What counts as “mitigated” for lead paint

For a paint or surface-coating hazard, the Act treats it as mitigated when the surface no longer gives off hazardous chips, flakes or dust; or children can no longer reach or chew it; or the coating is removed or covered or child access is otherwise prevented as the Department prescribes (Sec. 9(2)).

Before you renew, re-lease or sell that unit

Keep the paper trail

Save the notice, inspection report, any approved plan, contractor license and invoices, extension letters and the certificate of compliance. You will need them for the next lease. Put the deadline and the follow-up date in the free LeadSafeRules tracker so nothing slips.

More Illinois guides: Do Illinois landlords need a lead inspection? · Illinois lease lead disclosure checklist · Chicago · Naperville · Illinois statewide page

Got a notice? Put the dates where you will see them

Track the mitigation deadline, follow-up inspection and every lease date free.

Free deadline tracker Check a rental address Illinois disclosure packet PDF

Selling instead of renting? See the Illinois home-sale lead disclosure checklist.

FAQ

How long do I have to fix a lead hazard in Illinois?

30 days from receiving the mitigation notice if the unit was inspected because of an elevated blood lead level in a child or pregnant person, or if a child 6 or younger or a pregnant person lives there; otherwise 90 days (410 ILCS 45/9(5)).

Can I get more time on an Illinois lead mitigation notice?

You can apply to IDPH or its delegate agency for an extension. It may be granted if you are making substantial progress, cannot get a licensed lead abatement contractor in time, or are waiting on approval of a mitigation plan (410 ILCS 45/9(6)).

Can I rent the unit to a new tenant before the work is done?

No. An owner who received a mitigation notice must mitigate the hazard and obtain a certificate of compliance before entering into a new lease for that unit (410 ILCS 45/9.1).

Do I need a licensed contractor for lead mitigation in Illinois?

Mitigation that destroys or disturbs a lead-bearing surface must be done by a licensed lead abatement contractor using licensed supervisors or workers, unless Department rules or a case-by-case waiver allow otherwise (410 ILCS 45/9(3)).

What happens if the hazard is not fixed by the deadline?

After the follow-up inspection the agency serves a deficiency notice and a mitigation order listing the specific actions required, which can include abatement, and a new completion date (410 ILCS 45/9(7)).